Project Summary
Mine Life: 21 years
Resources: 5.1 billion lbs of contained Ni (4.04 billion lbs in-pit).
(Includes some historical)
Treatment Rate: 27.4 Mt per annum (75,000 tpd)
Nickel Production: 125.6 million lbs per annum
Capital Costs: C$1.2 billion
Nickel Price: C$8/lb
Operating Costs: C$4.29/lb Ni
Project NPV, 10% DR, C$8/lb Ni: C$1.06 billion
Project IRR at C$8/lb Ni: 21.8%
Payback Period: 3.9 years
Note: The above pre-tax and unleveraged economics of the Dumont Nickel Project are preliminary and are based on a conceptual study updated by Aker Solutions in July 2008. The above economics are subject to revision upon completion of a bankable feasibility study.